KO EN

E²S

Protective relay auto-diagnosis system

Overview

E²S

When protective relays installed on a power plant's equipment detect an incident, E2S receives the information in real time and automatically analyzes the problem. It analyzes relay data in real time over the IEC 61850 protocol used by the relays, and its fault analysis algorithms automatically diagnose the cause of the fault, countermeasures, actions to take and relay operations.

ABBSIEMENSSELGEDigital protective relays
Power facility fault detectedIEC 61850 (international standard)
  1. Event data collection
  2. Real-time analysis
  3. Automatic diagnosis
  4. Database
  5. Report generation

Why It Matters

Current situation

  • Protective relays are being replaced by digital IEDs (Intelligent Electronic Devices); protection work requires experts, making fast on-site response difficult
  • Relay operation data is collected manually when equipment fails
  • Internal and external experts analyze the data and take follow-up action
  • Analyzing the cause of relay operation typically takes about 6 hours

Immediate root-cause identification

  • When an incident triggers relay operation, its impact is very large, so the cause must be identified as quickly and accurately as possible

Immediate reporting

  • After a major incident, it is critical to determine exactly why relays operated and produce a report within a short time

Specialized expertise

  • Identifying the exact cause of such incidents requires deep knowledge and years of experience

Immediate on-site resolution

  • As a result, it is very hard for on-site staff to analyze the cause and write a report in a short time

Key Advantages

Accurate analysis, real-time analysis, automated response, top technology, stability

Interoperability through IEC 61850

  • Applies IEC 61850, the international standard for power utility communication, to ensure data safety, reliability and interoperability

Real-time response when relays operate

  • Continuous monitoring collects and analyzes data in real time when relays operate and generates reports immediately

Unique technology

  • A unique solution with no comparable product at home or abroad, protected by patents and proven through interlock tests with a wide range of relays
  1. Operate
    Protective relay operates
  2. Collect
    Real-time collection of operation dataIEC 61850
  3. Analyze
    Real-time analysis of collected dataIEC 61850
  4. Diagnose
    Real-time root-cause analysisPatented algorithm
  5. Report
    Expert report generation

Key Features

Continuous monitoring of relay operation

  • Communication status monitoring
  • Communication status alerts
  • Built-in communication management

Root-cause analysis when relays operate

  • Cause-and-effect analysis for each event when multiple events occur
  • Automatically diagnoses fault causes, countermeasures, actions taken and relay operations
  • Users can view voltage and current waveforms before and after relay operation on screen

Generation and delivery of relay operation analysis results

  • Generates analysis results in real time and keeps their history
  • Analysis results in an editable format
  • Save as PDF and other formats, and print

Analysis result management

  • Stores and manages relay operation analysis results in a database
  • Backup and restore of stored data
  • Conditional search

Expected Benefits

Better fault detection in protection systems and more reliable generation

Minimal generator downtime

  • When relays operate, the situation can be assessed quickly and accurately without an expert on site

Greater operational efficiency

  • Accumulated incident records make it possible to estimate recovery time and
  • plan the direction of future recovery systematically
  • Fault history of power equipment can be managed for electrical incidents
  • Plant staff can build up fault analysis expertise

Lower economic and social losses

  • Fast fault analysis and follow-up reduce economic and social losses
  • Stronger fault detection and generation reliability

Specifications

Interoperability and compliance with international standards

Supported equipment
  • ABB protective relays for generators, motors and transformers
  • GE protective relays for generators, motors and transformers
  • SIEMENS protective relays for generators, motors and transformers
  • SEL protective relays for generators, motors and transformers
Supported protocols
IEC61850
System operation
  • Runs without installing any agent on the protective relays
  • Operates using received data only, without sending any commands to the relays
  • Detects faults in real time when relays operate and analyzes causes automatically
  • Works in environments that mix relays from different manufacturers